S/N
|
PROJECT TITLE
|
CLIENT
|
LOCATION
|
STATUS
|
1.
|
The Construction Of Oredo “M” Single Flow Line
|
NPDC
|
Benin
|
Ongoing
|
2.
|
The Construction Of Oredo 12s And L Flow Lines
|
NPDC
|
Benin
|
Ongoing
|
3.
|
Hook-up and Tie-in of Oredo 8B, 10 and 11 Flowlines to their Respective Well Heads
|
NPDC
|
Benin
|
Ongoing
|
4.
|
Revamping of Obama Flow Station Process instrument (Service and Overhaul for all SOVs) in Obama Production Platform
|
NAOC
|
Obama
|
On-going
|
5.
|
Dredging, Welding and Laying of 10 Nos flowlines across Orashi river
|
NAOC
|
Obrikom/Obiafu
|
Completed
|
6.
|
Identification and Numbering of Flow lines In Kwale/Okpai Fields
|
NAOC
|
Kwale
|
Completed
|
7.
|
3kilometer flowline replacement at Oshie
|
NAOC
|
Oshie
|
Completed
|
8.
|
Pipeline emergency repairs at the entire Mosimi area
|
PPMC
|
Mosimi
|
Completed
|
9.
|
Rehabilitation of 24’ Escravos – Warri crude pipeline system
|
PPMC/NNPC
|
Escravos
|
Completed
|
10.
|
Recovery of flowline pipes at Oshie field
|
NAOC
|
Oshie
|
Completed
|
11.
|
Kwale – Okpai flowline lifting
|
NOAC
|
Kwale
|
Completed
|