...Providing Expertise and Solutions
+234(0)8033103855

Projects


S/N

PROJECT TITLE

CLIENT

LOCATION

STATUS

1.      

 

The Construction Of Oredo “M” Single Flow Line

NPDC

Benin

Ongoing

2.      

 

The Construction Of Oredo 12s And L Flow Lines

NPDC

Benin

Ongoing

3.      

 

Hook-up and Tie-in of Oredo 8B, 10 and 11 Flowlines to their Respective Well Heads

NPDC

Benin

Ongoing

4.      

 

Revamping of Obama Flow Station Process instrument (Service and Overhaul for all SOVs) in Obama Production Platform

NAOC

Obama

On-going

5.      

 

Dredging, Welding and Laying of 10 Nos flowlines across Orashi river

NAOC

Obrikom/Obiafu

Completed

6.      

 

Identification and Numbering of Flow lines In Kwale/Okpai Fields

NAOC

Kwale

Completed

7.      

 

 3kilometer flowline replacement at Oshie

NAOC

Oshie

 

Completed

8.      

 

Pipeline emergency repairs at the entire Mosimi area

PPMC

Mosimi

Completed

9.      

 

Rehabilitation of 24’ Escravos – Warri crude pipeline system

PPMC/NNPC

Escravos

Completed

10.   

 

Recovery of flowline pipes at Oshie field

NAOC

Oshie

Completed

11.   

 

Kwale – Okpai flowline lifting

NOAC

Kwale

Completed